Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

徐州丹云贸易有限公司

哈佛热水器,哈佛节能器,佛瑞德暖气片,家用中央空调,格力中央空调,艾尔新风系...

sell
  • There is no classification
contact
  • Contact:丹云暖通
  • Phone:0516-67669726
  • Email:192959830@qq.com
search
 
link
  • There is no link yet
home > sell > Bole is the first choice for wall-mounted fresh air system in Xuzhou
Bole is the first choice for wall-mounted fresh air system in Xuzhou
products: Views:4Bole is the first choice for wall-mounted fresh air system in Xuzhou 
brand: 博乐
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-06-14 15:16
 
Details
Wall-type heat recovery fresh air fan Fenduoike series
Product Description
Application
Energy-saving single room air supply and exhaust system, which can be used in apartments, villas and commercial residences.
Due to the heat recovery function, heat loss due to ventilation can be reduced.
Balanced humidity and adjustable gas exchange create an individually controllable microenvironment.
A whole house ventilation system can be established through the combined connection and centralized control of several individual wall ventilators.
Heat and moisture regeneration
High-tech ceramic energy saver with high heat recovery efficiency.
Due to its cellular structure, this unit has a large contact surface and high efficiency. This energy saver has excellent thermal conductivity and thermal energy storage capacity.
Installation method
This unit can be used for wall-through installation in circular holes in building exterior walls
The best ventilation solution is to install reverse-connected units in parallel. Some units ensure fresh air is introduced into the room, while others extract gases from the building. This provides the most effective and balanced ventilation.
To avoid architectural changes, these units are divided into two stages
Pre-installation (stage) During the interior decoration and outdoor wall painting and decoration stages. This phase includes the installation of retractable ducts, external hoods and cabling.
Final installation (stage) Before using the house, the heat accumulator, filter, connection to the ventilation unit, and automation are installed.
If mounting a vent hood on the exterior wall is not feasible, the unit can be flush-mounted and the exterior grille embedded in the exterior window frame with the help of a corner mounting kit, which needs to be purchased separately.
Request for quotation
A total of0articles  Related Comments: